Flow Meter Chamber Installation for Veolia at Draycott

Project Description

Jones Site Services & Installations has completed a new flow meter chamber installation for Veolia at Draycott. The chamber was built into the site so the flow being passed forward to the sewage treatment works can be measured and monitored, rather than inferred from pump runs and upstream readings.

Why the site needed a flow meter chamber

A treatment site is only as manageable as the flow data it can see. Without a dedicated measurement point, the volume leaving the site for onward treatment is estimated — from pump run times, from upstream readings, or from what arrives at the receiving works.

Installing a chamber with a meter in it gives the site its own measurement point in the flow path. The operational team can see what is actually being passed forward, compare it against what the works was designed to take, and have a reference when flows change or something upstream is not behaving.

What we installed

  • A new flow meter chamber constructed on site, set into the existing flow path
  • Internal pipework and the valve arrangement that isolates the meter for maintenance without taking the site out of service
  • Chamber cover set flush to finished ground level so the area stays usable and safe underfoot
  • Surrounding concrete slab and hardstanding made good around the chamber

How the works were carried out

The chamber was built and connected while the site stayed operational. The excavation, the concrete and the connections are sequenced around the site’s flow, the working area is segregated with barriers for the duration, and each stage is signed off before the next one opens up.

Because the chamber is a live asset once commissioned, the finish matters as much as the installation: cover to level, chamber clean and accessible, and the site team able to lift it for routine inspection without breaking anything out.

Mechanical and civil works on treatment sites

This is the kind of work we do most weeks — chambers, pipework, valves and process plant installed into live water and wastewater sites, with directly employed teams, our own plant and our own fabrication under one contract. If a scheme needs the civil works and the mechanical works from the same contractor, that is the point of us.

Questions we get asked

Can a flow meter chamber be installed without shutting the site down?

In most cases yes. The works are sequenced so the flow keeps moving — isolation is limited to the connections and commissioning rather than the whole site.

Who carries out the civils and the mechanical installation?

We do both, with directly employed teams, so there is no interface to manage between a civils subcontractor and a mechanical one.

Do you work for water companies and their tier-one contractors?

Both — directly for water companies and as a package inside larger contractors’ supply chains, on treatment works, pumping stations and process pipework across the UK.

Related work