Drainage Infrastructure Works Progress at Biffa, St Helens

Drainage Infrastructure Works Progress at Biffa, St Helens

Our team has continued making excellent progress on our drainage infrastructure works at the Biffa site in St Helens, delivering another successful phase of the project safely, efficiently and to programme.

During this stage of the works, our engineers carried out the removal of existing concrete road surfaces before excavating to formation level to install a new drainage run. Following installation, the pipework was surrounded with granular material, marker tape was installed and the trench was backfilled and compacted using the excavated material to provide a robust and compliant finish.

Works Completed

  • Concrete road cutting and breakout
  • Excavation to formation level
  • Installation of new drainage pipework
  • Granular bedding and surround installation
  • Marker tape installation
  • Backfilling and trench compaction
  • Preparation for ongoing reinstatement works

Plant Utilised

  • 8 tonne excavator with hydraulic breaker
  • 6 tonne dumper
  • Petrol floor saw
  • Wacker plate
  • Trench boxes
  • Manhole box

Project Overview

The photographs show the installation of the new drainage infrastructure, including excavation support systems, manhole construction, pipe installation and compaction operations. The works demonstrate our capability to deliver complex civils and drainage projects while maintaining high standards of safety and workmanship.